Rehabilitation and Upgrading of Salt Wastewater Treatment Plant

Location
Salt, Jordan
Client
Ministry of Water and Irrigation
Consultant
Dorsch International Consultants
Contractor
Arab Towers Contracting Company (ATCCO)

The Project

The Rehabilitation and Upgrading of Salt Wastewater Treatment Plant includes two parts. Part 1 involves the reconstruction and upgrading of the existing Salt WWTP to accommodate a capacity of 25,000m³/d. The reconstructed WWTP will include various components such as inlet works, primary settlement tanks, bioreactors, final settlement tanks, effluent filtration and disinfection, sludge thickeners, sludge digestors, combined heat and power (CHP) generators, sludge dewatering facilities, and ancillary structures.

Scope of Services

The scope of services included the design coordination, development of structural shop drawings, accurate estimation of bar bending schedules, preparation of architectural shop drawings, and the structural redesign and/or verification of certain structures. It ensured that all design elements were properly integrated and coordinated, while providing detailed drawings and information for the structural components. They accurately estimated the quantities and details of reinforcement bars, developed architectural shop drawings, and played a role in reassessing and modifying the structural design as needed. Our scope of work encompassed various aspects of the project, from design coordination to structural analysis and verification.

Our Projects Portfolio

Our projects portfolio is a visual journey through the success stories that define our company’s legacy

Seraj Tower

Amman – Jordan

Calcium Carbonate Grinding Plant - GCC

Jordan

Mr. Faris Al Sayegh Residence

Jordan

Mr. Abdlenour Residence

Jordan